Red Bull Headquarters

General Contractor: Inner Space Constructors
Architect/Designer: HLW

An old printing factory is “given wings”
The bare concrete floor in this 50-year-old printing factory was saturated with years of ink spills and was never intended to receive floor covering. When the floor would get wet, the ink would bleed to the surface and pool in a rainbow of colors. First, CIR needed to address the ink issue and prep the floor. Next, CIR had to find a product that would perform successfully for the client under these conditions in this high profile space for years to come. Despite a tight schedule, CIR located readily available products that met these requirements–while remaining on schedule and leaving the environment, quality, and design of the project uncompromised.